"Without looking at the qilian mountain snow, wrong zhang ye when jiangnan", in zhang ye this fortress jiangnan "cage" under the sunset dusk, when the good news of the photoelectric erector nearly at eight o ''clock in the evening seems to forget the time, the driver is still rumbling in the distance the roar of the, component installation, cable laying, check test, everything is in order. This is good news photoelectric zhangye in gansu province, 20 mw photovoltaic power station on the ground of the construction of the scene. After months of struggle, the power plant successfully started in June 28, interconnection, become beautiful (photoelectric another milestone in building large ground power station. 2500 kilometers across, from the region of jiangnan to jiangnan, this year''s poor photoelectric, continue to go on the domestic photovoltaic power station on the way.
Comfortable photovoltaic power station to do the first in the province to implement distributed generation (dg) in power generation project, better photoelectric will be expanded to a nationwide market. Since this year, well - photoelectric successively built in jiangxi province tai Ming 20 mw, 2 mw of jintan gold demonstration projects of solar photovoltaic power station project, such as changzhou municipal public building roof 2 mw solar building photovoltaic application demonstration projects, jiangsu SiHong 25 mw photovoltaic power station on the ground, new north district, changzhou is fai photovoltaic power station, etc. Through years of efforts, better photoelectric has become a set of "photovoltaic power station design, system integration, form a complete set of equipment, construction and operational management for the integration of photovoltaic power station construction professional company, and continuously for merchants to provide optimum technical solutions, the most cost-effective total package and the most reliable operation maintenance and management services.
|